PROJECT DESCRIPTION:
modernization and optimization of the production line
RESULTS:
- Close cooperation and diagnosis of client needs
- Install the weight of the mixer in order to verify the weight of dispensed material
- connected to the controller weight (manual and automatic) for the packaging line
- developing a system of visualization - the ability to view status of equipment on the production line from your office computer
- implementation of the original system of reporting
- use of graphics and the clarity of the production node scheme allows rapid orientation in the current situation of production
- the opportunity to register alarm
- reporting system: of the day and the operator of the order
-
installation and commissioning in less time than assumed
SOLUTIONS:
DeviceNet network, the network 232, the package RSView